REVISION 0: Southern Sector airlift recirculation wells SSR-002 thru SSR-012 are to be placed out-of-commission and abandoned in place. All wells, …
Replacement of damaged solenoid valve on 235-F E5 fan.…
Install a Quonset Building in the K-Area Construction Fabrication Area.…
Design, install, implement use of a robot/robotic arm within the K-Area 105 Building Materials Storage Area (MSA).…
105-L Skoda Cask Equipment Qualification/Processing/Shipment Preparedness.…
Renovation to rooms 139, 140 and 148 in 737-A.…
Replace Fire Alarm Panel / Components at 785-6A and 785-1A.…
The common copper service water header in 784-7A is being replaced with PVC piping. This activity is being performed to minimize the potential risk…
Deteriorated ACM (Asbestos Containing Material) window glazing will be removed and replaced at 760-11G.…
Subcontractor will provide roof repairs at 211-42H. The Subcontractor will not disturb the existing roof while performing these repairs on 211-42H.…