Renovate the interior of 713-N.…
CX-030896: Modification of Building 714-N for the Relocation of Lead Acid Battery Storage/Operations
Due to the future relocation of Salvage Yard Lead Acid Battery Storage Operations from 741-2N to 714-N, proposed modifications are needed to adequa…
The Western Sector Treatment System (WSTS) operates under a United States Environmental Protection Agency (USEPA) risk-based approval for polychlor…
Modify TRU Pad 26 to Remove Equipment Currently Installed.…
Painting without stripping/sanding/scraping in L Area Complex.…
The HVAC unit at ETF is out of service. Temporary use of 2 heat pump units containing a maximum of 12 lbs of R410A refrigerant each, will be utiliz…
The 50-ohm resistance thermal device (RTD) for 15.3 will be replaced with a 100-ohm Platinum (Pt) RTD. The control system shall be reprogrammed to …
Configuration Changes Necessary for safe Operation of the Chemical Injection System Which Injects CL4132 to the Service Water Header.…
The current capacity of 607-7B Sanitary Lift station is undersized based on existing personnel loading in building 730-2B and 730-4B. The 607-7B sa…
Building 707-1F is in need of minor repairs/renovations prior to housing personnel in office spaces.…