Handrails, anchorbolts and baseplates around L-Area (exterior) will be repainted to stop rusting.…
Herbicide applications in Solid Waste Management Facilities and F-Area.…
The Proposed Activity is for E-DCF-H-09750 to add an extension to the ARM-8 detector in 264-2H Cask Receiving.…
Removal of F-Area perimeter fence, associated gates, and all posts North of 707-F to vendor parking. F-Area perimeter fence located north of buildi…
Routine maintenance activities and custodial services for SRPPF Complex Area buildings, structures, rights-of-way, infrastructures, during which op…
Relocate Rosemount Glovebox Oxygen Monitor LL6 pump plate.…
SRTE perimeter upgrades will involve: Aircraft Cable Refurbishment and Upgrades, placement of new jersey barriers. Placement of jersey barriers wi…
Install new 1 inch rigid galvanized steel (RGS) conduit and conductors to fans VVS-FAN-1 and 2 at 776-1A and 776-4A.…
This EEC to cover renovations, repairs, and modifications to the metal siding and metal flashing of the outside of 786-A.…
The Kaplan and Lin lab are conducting rad and non-rad studies to investigate cement leachate impact factors for sediments.…