The 512-S building, which is currently in the Suspended Operations state, will be modified to temporarily store Strip Effluent (SE) from the Salt W…
Modifications for compressed gas storage in L-Area.…
Apply Roof Sealant to 704-1N.…
Fence line around the SRNL Limited Area has numerous places in need of repair and gates need repair to maintain operability.…
This Environmental Evaluation Checklist discusses the installation of piping, transformer, distribution panel, electrical components, and a catalyt…
Re-develop 22 piezometers and 2 inclinometers in the vicinity of the Steel Creek Dam, and 48 piezometers in the vicinity of PAR Pond Dam. Eleven (1…
Subcontractor will provide roof repairs at 704-H. The Subcontractor "will not" disturb the existing roof while performing these repairs on 704-H.…
Remove/Replace Air Handling Unit in the 704-K Building.…
Nondestructive exam of chilled water valve/piping and necessary repair of piping, valving, etc. in K-Area Purification Area.…
Installation of telecommunications, video capabilities, etc. in 705-K Administration Building.…