Repair drainage and sidewalk in front of 722-A and 784-7A.…
The 50 Ohm resistance thermal device (RTD) for 8.4 will be replaced with a 100 Ohm Platinum (PT) RTD. The associated recorder shall be reprogramed …
Repair Drainage in Parking Lot South of 704-60E .…
Removal of LANA material from PS Hydride Beds A and D.…
This EEC covers various general renovations for Building 723-A, such as flooring/cove base replacement, ceiling tile replacement, painting, and ele…
The existing underground feeder 2-2 (13.8Kv) failed at 151-1L and will be replaced. The PILC cable that has failed was the original cable 70 years …
The Scope of Work details the extraction of asphalt core samples from multiple locations along Road 8 to support SIE (Site Infrastructure Engineeri…
The work scope involves the extraction of three (3) different asphalt core samples, taken at random location along Road G. These samples will be us…
The work scope involves the extraction of asphalt core samples from multiple locations in F-Area to support the widening of the roads to support ad…
Installation of Wi-Fi in 723-A.…