Vent 19 miniature equipment gas cylinders at 737-A.…
Establish a field location and install a 10-year field experiment to simulate and study the movement of radionuclides through an artificial vadose …
SRNL will study the mechanisms of iodine attenuation by using two commercially available organoclays PM-199 and MRM.…
Installation of electric vehicle charging stations across SRS.…
The US Army Corps of Engineers (USACE) will subcontract the final design and construction of Barricade 9 Entry Control Facility (ECF) replacement. …
trickle flow of process water is required to help prevent J-Tube blockage of the Sludge Receipt and Adjustment Tank (SRAT) Sample and Transfer Pump…
SRS Community Reuse Organization (SRSCRO) will remove assets associated with 784-A.…
Replace fire door assembly at the stairway leading onto the roof at 717-F.…
Install Desk in ISO Container 10 at 645-4N.…
Modifications and renovations to Building 707-C will be made so the structure may be used as the Backup Computer Facility (BCF).…