Testing will be performed in the 773-A E-wing Shielded Cells. The glass will be composed of frit, non-radioactive simulant (fabricated at 999-1W), …
Office of NEPA Policy and Compliance
July 17, 2025Testing will be performed in the 773-A E-wing Shielded Cells. The glass will be composed of frit, non-radioactive simulant (fabricated at 999-1W), Fast Critical Assembly (FCA) simulant made at SRNL containing Pu from SRS HB line, and additional raw materials to add U, Th, and Gd.