905-119H Flush Line needs a hard pipe discharge connection to the basin to mitigate a safety hazard. A flow meter will also be installed to provide…
Office of NEPA Policy and Compliance
May 20, 2025905-119H Flush Line needs a hard pipe discharge connection to the basin to mitigate a safety hazard. A flow meter will also be installed to provide system performance monitoring. The discharge connection from the flush line to the basin is a flexible hose on the ground. The 905-119 flush line does not have a flow meter installed.