The Proposed Activity, during time of Construction, will remove obsolete D/3 Distributed Control System (DCS) hardware from the 233-H HP-PLC (Healt…
Office of NEPA Policy and Compliance
July 8, 2025The Proposed Activity, during time of Construction, will remove obsolete D/3 Distributed Control System (DCS) hardware from the 233-H HP-PLC (Health Protection-Programable Logic Controller) and eleven Input/Output (I/O) Modules (Drops 1, 2, 3, 4, 5, 6,7 8, 9, 10 and 11), UPS-PLC (Uninterruptable Power System) and I/O Modules, front end DCS, and, if needed, will remove designated Air Monitoring Simulator hardware.