This modification will replace E3S components in L-Area with Argus.…
Load Center-B1 will be taken out of service for Preventative Maintenance.…
Demolition and disposition of bldg. 703-1B uninterruptible power supply.…
Rad samples are analyzed on the Rad Microtrac S3500 Particle Size Analyzer located in 773-A C-150. Non-Rad samples are analyzed on the Microtrac S3…
Augusta Industrial to pressure wash internal cooling tower basin at 285-11F.…
Remove suspect asbestos material from metal 291-H Breech House and concrete stack joint.…
Replacement of area velocity flow sensor at stream surveillance location FM-A7.…
Remove suspect asbestos material from metal 291-H Breech House and concrete stack joint.…
Repair, prep, and paint interior walls at 704-N.…
Two characterization soil borings will be advanced near Building 717-A to verify the presence or absence of residual volatile organic compound mass…