This EEC covers the evaluation and corrections of HVAC compressors units in 773-A.…
Mini-Thermal Cycling Absorption Process (TCAP) components are to be designed and installed into secondary confinement in TEF, and tied in to TEF Di…
This activity is for preventative maintenance (PM) of air handling units in room 212 of 735-B.…
A study of the thermodynamics and reaction kinetics of hydrogen on catalytic materials is being conducted.…
WTG uses the Environmental chamber (EC) in 723-A for Function testing as requested by the DA’s and for unloading as requested by SRTE.…
Temporary restroom trailer is to be located West of Trailer 704-49S.…
Paint doors on 4th level of H-Canyon to repair scratches as needed.…
This modification will transition all of the head-end components of the E3S Closed Circuit TV system to IVAS.…
SRNL often receives samples from the SRS Tank Farm and DWPF for chemical and physical property measurements.…
Remove existing carpet, tile and mastic, abating asbestos and installing new carpet flooring within designated areas of Section A, Building 773-A.…