AHU No. 3 motor replace and rework at the shop No. 127 at 735-B.…
Installation of electric vehicle charging stations across SRS.…
This scope is to support the leak / low pH in the sewer drain lines leading to the H-12 Outfall. Water from standpipe will be pumped into P10B.…
E-DCP-H-18007 is for the replacement of Motor Control Center (MCC)-J.…
SREL intends to excess 29 handy houses of varying sizes to the SRSCRO.…
Construction is to patch holes in the flooring in fan motor compartment of AHU No. 1 and No. 2.…
The backflow preventer is located in the 285-4F courtyard. A replacement is available on site and will be utilized for the repair.…
The H-Canyon Central Exhaust Fan #3 breaker failed and damaged the entire cubicle (HS-254019-ELNH-MCC-C-EC-3A). This cubicle needs to be replaced.…
Power is to be relocated for the process water well at 905-20A to be fed from the A6 feeder.…
The goal of this work is to produce novel materials using the ball milling method of alloying under different gaseous atmospheres.…