This EEC to cover renovations, repairs, and modifications to the metal siding and metal flashing of the outside of 786-A.…
The purpose of this EEC is to support the administrative action of processing a successor Land Lease Agreement for the SBA Landfill Cell Tower Site…
The overarching goal of the study is to provide an initial characterization of the spatial distribution of abiotic and biotic contamination levels …
Remove the existing REDC Soak Tank and replace it with a new tank.…
Modify 292-S HVAC systems by removing and replacing aging, obsolete, and/or no longer needed system equipment.…
Proposed Activity includes routine electrical clean and inspect switchgear maintenance to Load Center B7 and various Temporary Modifications to pro…
Paint piping at 905-53A.…
Establish 9 new vadose zone lysimeter stations in E-Area around the perimeter of ET3, ST8, and ST9.…
Repair holes in the drywall inside the stairwell at 717-F.…
The DESC Switchyard at the 681-3G River Pumphouse is being rebuilt due to aging equipment and current site needs.…