Purpose of this EEC is to support the administrative action of processing a successor Land Lease Agreement for the SBA N-Area Cell Tower Site betwe…
The researcher will release headstarted gopher frogs at three sites and compare survival under different release and vegetative restoration methods…
Replace MPC 13Ton Power Cable due to contamination.…
Subcontractor will provide roof repairs at 707-F.…
Because the Caustic Feed Tank Cold Sampler (S329-010-088-00-S) is no longer needed, all the sampler equipment can be removed.…
Disassemble and remove sections of nitrogen piping line NNG509 and install piping blinds.…
The activity is to install a new shower and vanity sink at 704-3N.…
Rev 6-Domestic water isolations to support D and D of 235-F will require a Site Clearance permit.…
Augusta Industrial will suck/pump slurry sediment from the 285-H basin cells and transfer to a de-watering box. The dry sediment will be transferre…
Perform grading around building 710-17N to help with storm water runoff.…