Work is for a cultural survey by Plateau Geoscience Group as part of preparation for undergrounding of distribution lines in the project area. The …
Installation of mesh pole wraps to mitigate wildfires. …
Vegetation management within Right-of-Ways. Thirty miles of copper conductor replacement. Replacement of electric poles. …
Replacement of approximately 90 wooden power poles with steel poles. Pole top covers are to be installed at various locations along with vegetation…
This Programmatic NEPA CX will cover all activities under Substation Stabilization Priority Projects, Repairs to Transmission Facilities, Priority …
Overhead to underground conversion of approximately 6 miles of power lines. …
New 3-phase underground power line (approx. 0.5 mile), a new cable installed by boring under the Pen Oreille River (approx. 0.25 mile), and the reb…
Replace approximately 5,121' of conductor from overhead to underground. Additionally, 8,800 feet of conductor will be replaced with newer single-ph…
DOE and the DOE DOGE Team identified a land asset located in Illinois which DOE had acquired to support an energy-related project which has since b…
Site preparation and restoration for utility pole replacement - removing utility poles that are over 30 years old and structurally compromised, ove…