The project involves replacing existing meters with new, advanced meters and metering equipment throughout SIEC's service territory. The installati…
Installation of long duration battery energy storage system (LD-BESS), grid-forming inverter, charge controller, and all necessary electrical equip…
Construct 0.76 mi. of 3-phase line to connect two circuits. Install a 3000kVa transformer to connect two circuits. Convert 1.5 mi. of 1-phase lin…
MVEA to reconstruct nine and one-half (9.5) miles of No. 8 CopperWeld single-phase conductor to No. 2 ACSR single-phase overhead conductor. CopperW…
Characterization activities for CO2 storage complex to include: drilling stratigraphic test well, well logging, well coring, lab experiments, site …
EECA proposes the dedication of approx two (2) acres for development of a new warehouse facility (60'x150' shed) and outside rock/concrete covered …
The Sylvania electrical system would like to replace all existing three phase poles that are failing within the electrical system. Over 90 percent…
The current infrastructure is 3.9 miles of overhead copper wires with 95 poles. This infrastructure was installed in the 1970s and is outdated. T…
The Rinaker-Palmyra Tie Line Project includes right-of-way vegetation clearing along new and existing easements, as well as construction and instal…
CarbonSAFE Phase III project - Subtask 4.1 Pore space leasing. …