This Specific CX addresses the need to measure methane emissions at Jonah Energy facilities in the Upper Green River Basin, WY via mobile laborator…
Replacement of a 5kV structure and upgrade to 13.8kV, undergrounding of cabling and installation of monitoring systems.…
Complete front-end engineering design (FEED) and develop cost estimate for CO2 capture from cement plant flue gas, complete TEA, LCA, business case…
18 aged transmission poles and 1.5 miles of transmission line with distribution line under will be replaced. Pole holes dug with auger or backhoe. …
The project plans to perform vegetation management along a 22.2 mile access road with a Fecon Mulcher and an Excavator with a mulcher head barged t…
A new Advanced Combustion Concept Evaluation Laboratory (ACCEL). This project includes testing super critical carbon dioxide and oxygen combustion …
Proposed project activities will making several critical infrastructure upgrades in areas prone to frequent outages, including substation upgrades,…
BESS installation and microgrid creation at 3 locations to allow the locations to island during times of extreme weather. The microgrids will help …
Overhaul of 40 year old bulb-type generator at the Reregulating Dam powerhouse facility.…
The tribe plans to sub award to their own division of commerce and utilize the 3rd party contractor, Biosafe, to complete the work. They plan to in…