Categorical Exclusion Determinations: National Energy Technology Laboratory

The Sylvania electrical system would like to replace all existing three phase poles that are failing within the electrical system. Over 90 percent…
The current infrastructure is 3.9 miles of overhead copper wires with 95 poles. This infrastructure was installed in the 1970s and is outdated. T…
This project would conduct a study of the current electrical system to identify power poles that are a hazard due to age and wear. Replacements of …