This project will consist of the purchase and installation of a dual-fired, natural gas and hot water, double stage absorption chiller.…
Project's primary objective is site characterization including water sample collection, drilling an USDW well, aerial studies, soil gas sampling, a…
Demonstrate the feasibility of a carbon capture and storage project at the Tennessee Valley Authority (TVA) Paradise Power Plant in Muhlenberg Coun…
The Recipient is responsible for ensuring that all activities involving small unmanned aircraft systems (sUAS) are compliant with 14 CFR Part 107 o…
The proposed project is broken into two parts, with the first part covering reconductoring and reconstruction of a single-phase line serving the po…
Replace overhead power line with underground cable within existing easements. …
Electrical device upgrade and replacement (over-current reclosers and communcation base stations).…
Electrical device upgrade and replacement.…
Upgrading overhead power lines with larger conductor. …
Replacing electric poles to ensure more reliable service. Implementing monitoring systems at the Anson Substation. Strengthening infrastructure at …