The subrecipient proposes vegetation management to roughly 35 miles of urban circuits along the following: 1) 22 miles (out of the 35-mile circuit)…
The Geary County Infrastructure Upgrade Project will be used to upgrade 16 miles of copper weld electric distribution lines in rural Geary County, …
MDU plans to construct a 230/46 kV addition to the Merricourt Transmission Substation to interconnect two new 46 kV sub-transmission lines, providi…
Excavating and constructing pad mounted electrical equipment for step down interconnection for the City of Luray to Western Cooperative.…
Fall River Rural Electric Cooperative plans to underground 3.22 miles of existing distribution lines in a heavily forested area in and next to Cari…
Rebuilding 2.75 miles of overhead transmission line in Atlantic Beach NC, includes: surveying, vegetation trimming, boring vertical holes to set n…
The City of Corwith plans a comprehensive grid resilience project that includes replacing approximately 158 wooden poles, 100 percent of crossarms,…
Purchase a Caterpillar Excavator 320 equipped for mulching and tree clearing, to be utilized for mulching roadsides and runway areas to create effe…
FEC plans to installation of a 1,000 kW/4,000 kWh containerized lithium-ion battery energy storage system (BESS) within the existing developed oper…
Wooden pole replacement (140)…