MVEA to reconstruct nine and one-half (9.5) miles of No. 8 CopperWeld single-phase conductor to No. 2 ACSR single-phase overhead conductor. CopperW…
Characterization activities for CO2 storage complex to include: drilling stratigraphic test well, well logging, well coring, lab experiments, site …
EECA proposes the dedication of approx two (2) acres for development of a new warehouse facility (60'x150' shed) and outside rock/concrete covered …
The Sylvania electrical system would like to replace all existing three phase poles that are failing within the electrical system. Over 90 percent…
The current infrastructure is 3.9 miles of overhead copper wires with 95 poles. This infrastructure was installed in the 1970s and is outdated. T…
The Rinaker-Palmyra Tie Line Project includes right-of-way vegetation clearing along new and existing easements, as well as construction and instal…
CarbonSAFE Phase III project - Subtask 4.1 Pore space leasing. …
This project would conduct a study of the current electrical system to identify power poles that are a hazard due to age and wear. Replacements of …
Ravalli Electrical Cooperative plans to underground 21.3 miles of existing distribution lines in a designated high wildfire hazard potential area l…
Sunnova in partnership with Penobscot Nation will Develop a 1,960kWh renewable Battery energy Storage project consisting of PV roof top solar on ex…