Construction of a 34.5 - 14.4/24.94Y, 12/16/20 MVA substation including, but not limited to, disturbing an area of not more than two (2) acres by c…
Preparation and fabrication of polymeric and ionic-liquid based membrane and the characterization of their rheology and electrical and gas transpor…
No physical activity that will disturb land or water will occur for this advanced modeling technology project. …
Perform experiments for algal cultivation, integrating with CO2 sorbent for CO2 release and hydrogel for nutrient release. Perform cultivation scal…
The recipient will rebuild its existing 220-47 230kV circuit which will reduce the frequency of transmission line outages caused by equipment failu…
The proposed project includes the replacement of 1,949 expulsion fuses with non-expulsion fuses, replacement of 56 three-phase hydraulic reclosers …
Installing new feeder lines from the switchgear to the substation transformer. …
Project's primary objective is site characterization including water sample collection, drilling an USDW well, aerial studies, soil gas sampling, a…
CARPE DIEM project is to deploy distribution level power flow controllers to a large utility at scale, and to incorporate this technology into thei…
Front-End Engineering Design (FEED) Study for a Post-Combustion Carbon Capture (PCCC) system at Calpine's Pastoria Energy Facility (PEF) in Lebec, …