The work performed in the Biogeochemical Processes Lab investigates changes in microbial ecology, geochemistry, and geology driven by energy indust…
Wheatland will complete a system resiliency project within their service territory focusing on infrastructure hardening to help reduce outages due …
Wooden pole replacement (34).…
Overhead to underground conversion for approximately 8.1 miles of powerline. …
Laboratory material analyses. …
Laboratory analysis in support of characterization of a geologic storage site.…
Work is for a cultural survey by Plateau Geoscience Group as part of preparation for undergrounding of distribution lines in the project area. The …
Installation of mesh pole wraps to mitigate wildfires. …
Vegetation management within Right-of-Ways. Thirty miles of copper conductor replacement. Replacement of electric poles. …
Replacement of approximately 90 wooden power poles with steel poles. Pole top covers are to be installed at various locations along with vegetation…