CX-034839: LCRA Sim Gideon (Power Generation Facility) Comprehensive Control and Monitoring Upgrades
Sub-recipient will Upgrade AVR with Power System Stabilizer, remove and replace disturbance monitoring equipment, install real-time vibration monit…
The subrecipient will install 80 pole-mounted reclosers, system-wide.…
Sub-recipient will construct scaffolding, remove existing assemblies, demolish existing pipe and enclosure insulation assemblies and remove existin…
Sub-recipient will install a new wet pipe fire sprinkler system and an additional water supply connection in Units 1,2, and 3 mezzanine and ground …
Upgrading mining site to 3-phase power. Upgrading along existing overhead lines and adding a transmission pole. Installation of a meter and transfo…
Recipient will deploy the DLR technology (WireWarrior sensors) using drone and integrate DLR data into a simulated grid operations and scheduling e…
The project will be targeting poles that are currently over 50 years old and have a transformer. In addition, priority will be placed on transforme…
KEM Electric Cooperative plans to replace protective devices within existing substation fences and at existing wood pole locations in existing util…
The project will involve the deployment of a thermal energy storage (TES) system to enhance the resilience of the tribal community in Nevada. The p…
35 poles have been identified to be changed due to cracking, shell rot or woodpecker damage. In addition, hardware will be tightened and replace ro…