Add 2 pole-mounted communicable electronic reclosers and 1 pad-mounted communicable electronic switch to pre-existing poles and ground sleeve for t…
Reroute existing overhear distribution lines as identified to existing roadway ROW's with underground distribution lines.…
The Klickitat PUD will upgrade approximately 7.5 miles of old, outdated poles, some dating back to 1947. The current poles will be replaced with ta…
Build a 9.75 mile 3-phase overhead distribution electric line on private property along HWY 30 to connect two distribution feeders. This will consi…
DOYON LTD. Plans to overhaul the diesel generator in the City of Galena with the following updates: 1. Installation of the VFD, silencer, radiator …
Install fault indicators, recloser devices, and reconfigure/underground (where feasible) nine miles of older primary wire. These measures improve o…
The Klickitat PUD will upgrade approximately 8,500 feet of old, outdated single phase distribution line to three phase line. These upgrades include…
Conduct initial engineering studies to determine and prioritize which grid components to further invest in.…
Conduct initial engineering studies to determine and prioritize which grid components to further invest in.…