Planned activities include the construction of a new 24-inch steel natural gas pipeline spanning approximately 3.75 miles along the existing PREPA …
Installation of battery energy storage systems of various sizes at five sites: Site 1 - Ooltewah, TN, Site 2 - Signal Mountain, TN, Site 3 - River …
The primary goal of the project is to scale up the previously developed process from bench scale to pilot scale. The pilot facility will aim to pro…
Direct Air Capture (DAC) research for removing carbon dioxide from air.…
Wooden pole replacement (103) and associated insulators (306) in existing ROW. …
Overhead to underground conversion of ~3 miles of powerline in Chattanooga, TN. …
Install SCADA and OMS at New Albany office and automation systems at the Blue Springs substation, Hickory Flat substation, NE New Albany substation…
Overhead to underground conversion of ~2 miles of powerline in Chattanooga, TN. …
Overhead to underground conversion of ~4 miles of powerline in Chattanooga, TN. …
Twin County EPA is proposing four integrated projects, reconductoring and constructing a 1.5-mile tie line between Refuge and Swiftwater substation…