Install 6 new 69kV transmission breakers, multiple disconnecting switches, and protection relays. …
The PIO13 project involves the undergrounding of approximately 9.5 miles of overhead lines, which will increase reliability by virtually eliminatin…
Approximately 1.8 miles of the current overhead utility alignment will be moved from aerial that is along old highway 101 to underground along the …
Grid hardening through improving our infrastructure. Rebuild existing transmission lines to improve reliability by using steel poles and to increas…
The Pittsburgh Electromagnetic Characterization Laboratory will be used to perform magnetic, optical, and electrical transport measurements for the…
Design and development of a Microgrid Resiliency Station to be constructed near the Spokane Tribal Administrative Offices. This project will includ…
The project focuses on enhancing grid resilience through infrastructure upgrades, including hardening critical facilities, integrating and improvin…
Installation of poles, overhead wires, distribution switches, electric relays and all associated hardware.…