Installation of 1 battery energy storage system (BESS) and electrical connection of essential businesses and residences in close geographic proximi…
Installation of 1 battery energy storage system (BESS) and electrical connection of essential businesses and residences in close geographic proximi…
Installation of 1 battery energy storage system (BESS) and electrical connection of essential businesses and residences in close geographic proximi…
To convert approximately 6,500 ft. and 12,500 ft. of overhead lines to underground. …
This project is research, development, and demonstration (RD and D) of reducing wildfire ignition risks by finding and fixing failing devices prior…
Jamestown S'Klallam Tribe plans to purchase a bucket truck to use for vegetation management and allow the PUD emergency access to decrease the time…
The Recipient will install and configure a modeling tool and import data to enable the Recipient to model wildfire risk for planning and operationa…
Planning for PECO to rebuild its 220-47, 220-69, and 220-31 230kV circuits which will reduce the frequency of transmission line outages caused by e…
The project will assemble and operate CO2/H2/O2 fermentation manifolds and bioreactors customized for operation on gas feedstocks. …
The DIGITAL project will accelerate the clean energy transition and the required grid investments by reducing the time it takes to review, approve,…