Upgrading mining site to 3-phase power. Extending power from transformer/meter to a switch gear unit. Installation of a 2000A switch gear unit. Ext…
Office of NEPA Policy and Compliance
January 22, 2026Upgrading mining site to 3-phase power. Extending power from transformer/meter to a switch gear unit. Installation of a 2000A switch gear unit. Extend wiring from the switch gear and then tying in to the mining equipment on-site (crushing/sorting units).