The Surface Analysis Laboratory project houses an x-ray photoelectrons spectrometer, which consists of a vacuum chamber with associated pumps and e…
Installation of three sets of new pole mounted fiber optic sensors, a new motor-operated three-way high-voltage switch with vacuum interrupter tech…
Troy Power and Light plans to replace old electric meters with new smart meters, attaching repeaters to existing power poles to establish a network…
UMass Amherst plans to upgrade the campus's existing medium voltage electric distribution system through the installation of five Automatic Transfe…
Design, installation, and operation of a iron-air multi-day storage system: which would include: site grading and temporary construction facilities…
Project's primary objective is site characterization including a 3D seismic survey in Chambers, Jefferson, and Liberty counties, TX.…
Project's primary objective is to complete a storage complex feasibility study. This CX covers only Group A activities, which include routine admin…
Reconductor existing overhead lines at river crossings, replacing bare conductor with covered conductor. In some locations will convert from under…
The project scope includes replacing approximately five circuit miles of outdated copper powerline conductor with new aluminum conductor. This proj…