Demonstrate the feasibility of a carbon capture and storage project at the Tennessee Valley Authority (TVA) Paradise Power Plant in Muhlenberg Coun…
The Recipient is responsible for ensuring that all activities involving small unmanned aircraft systems (sUAS) are compliant with 14 CFR Part 107 o…
The proposed project is broken into two parts, with the first part covering reconductoring and reconstruction of a single-phase line serving the po…
Replace overhead power line with underground cable within existing easements. …
Electrical device upgrade and replacement (over-current reclosers and communcation base stations).…
Electrical device upgrade and replacement.…
Upgrading overhead power lines with larger conductor. …
Replacing electric poles to ensure more reliable service. Implementing monitoring systems at the Anson Substation. Strengthening infrastructure at …
Conduct soil gas sampling in support of site characterization activities for CO2 storage complex.…
MVEA proposes to upgrade the Black Squirrel and Gresham substations to be SCADA ready. This includes upgrading six existing substation recloser con…