The Advanced Scale Up Reactor Experiment (ASURE) facility factors heavily in the National Energy Technology Laboratory's (NETL) Gasification Multi-…
The project involves replacement of approximately 16.4 miles of existing 2/0 ACSR and No. 2 ACSR electric distribution lines with upgraded 336 ACSR…
Remove and replace 234 aging existing distribution structures, including poles, crossarms, and insulators, with new components designed to meet mod…
ROW and easement clearance will take place approximately 12 miles from the Lovell Canyon turn off. This will consist of road construction and clear…
To remove old power lines on wooden poles running through a heavily vegetated, fire-prone area and reroute them away from wildfire zones onto four …
Replacing existing aging pole structures with new pole structures.…
An existing 10 MVA station transformer will be replaced with a larger capacity transformer inside of an existing substation. An automated circuit b…
Changing out existing power poles/reclosers with new poles and sophisticated protection equipment. HEC will also be adding communications equipment…
The project will expand the existing network of fire-weather stations and wildfire detection cameras, and install AI-enabled grid monitors on feede…
Upgrade transformer along with instrumentation and relay devices within fenced area of power distribution substation. Upgrade/relocate three miles …