The project shall consist of the design and installation of a new substation transformer as well as construction of storage pad for existing transf…
In-kind replacement of existing overhead top of pole electric cable, utilizing the majority of existing utility poles, replacing pole top conductor…
Vegetation management to minimize outage frequency and duration along Bromley Rd in Chester MA.…
Vegetation Management (tree trimming, brush reduction, etc.) around distribution power lines in existing Right of Ways (ROWs).…
This CX is to conduct a Phase 1 archaeological survey within the full area of potential effect (encompassing approximately seven miles total) for J…
The project involves replacing existing meters with new, advanced meters and metering equipment throughout SIEC's service territory. The installati…
Installation of long duration battery energy storage system (LD-BESS), grid-forming inverter, charge controller, and all necessary electrical equip…
Construct 0.76 mi. of 3-phase line to connect two circuits. Install a 3000kVa transformer to connect two circuits. Convert 1.5 mi. of 1-phase lin…
MVEA to reconstruct nine and one-half (9.5) miles of No. 8 CopperWeld single-phase conductor to No. 2 ACSR single-phase overhead conductor. CopperW…
Characterization activities for CO2 storage complex to include: drilling stratigraphic test well, well logging, well coring, lab experiments, site …