Replace approximately 5,121' of conductor from overhead to underground. Additionally, 8,800 feet of conductor will be replaced with newer single-ph…
DOE and the DOE DOGE Team identified a land asset located in Illinois which DOE had acquired to support an energy-related project which has since b…
Site preparation and restoration for utility pole replacement - removing utility poles that are over 30 years old and structurally compromised, ove…
The Rinaker-Palmyra Tie Line Project includes right-of-way vegetation clearing along new and existing easements, as well as construction and instal…
Collecting 20-miles across 4-lines of 2-D surface seismic data.…
This project will include vegetation management in the right of ways (ROW) identified in the map provided and in 69.77 miles of ROW. The work will …
Mason PUD 3 is upgrading it's Pioneer Substation from a 25 MVA unit to a 40 MVA unit along with new relay panels that will allow higher electric lo…
Bradford Township replacement of existing Electric Substation facility will include excavation of a grounding grid, poured cement piers for substat…
The project objective is to develop a system engineering approach for produced water resource extraction and management in oil and gas operations.…
Installation of electronic reclosers. The majority will be installed on existing poles within rights-of-way while some instances of new poles withi…