The IMPACT Lab consolidates the space and scope of three existing NETL R and D laboratories under one integrated laboratory housing characterizatio…
Underground existing overhead line via trenching/conduit, remove/retire old overhead system. All work would be done on right-of-way or existing eas…
Upgrade 8,000 feet of primary power lines (overhead) and replace Approximately 100 power poles.…
Specifically, the scope includes constructing two new marine header pipelines supported by helical piles, installing a new road crossing pipeline a…
San Luis Valley plans to replace single phase line, replace old conductor with tree wire, underground or move lines out of forested areas, and remo…
Project involves removal of 72 poles and approximately 3.95 miles of existing overhead electrical conduit. …
Northern Lights proposes the replacement of a 5.75 mile existing line with a new line, 4.5 miles overhead, 1.25 miles underground, as well as repla…
Using the existing rights-of-way, 5.5 miles of overhead line along County Road 0 between Millston and Whitney Road will be converted to underground…
A general-use laboratory for fuel, energy, catalytic, surface, and materials science. The laboratory will contain synthesis and characterization of…
Substation Modification - Installation of Advanced Power Flow Controller.…