The current infrastructure is 3.9 miles of overhead copper wires with 95 poles. This infrastructure was installed in the 1970s and is outdated. T…
The Rinaker-Palmyra Tie Line Project includes right-of-way vegetation clearing along new and existing easements, as well as construction and instal…
CarbonSAFE Phase III project - Subtask 4.1 Pore space leasing. …
This project would conduct a study of the current electrical system to identify power poles that are a hazard due to age and wear. Replacements of …
Ravalli Electrical Cooperative plans to underground 21.3 miles of existing distribution lines in a designated high wildfire hazard potential area l…
Sunnova in partnership with Penobscot Nation will Develop a 1,960kWh renewable Battery energy Storage project consisting of PV roof top solar on ex…
Trenching for underground power cable. Installation of underground electrical equipment, including pad-mounted transformers and grounding/sectional…
The City of Newton is proposing the Line D Rebuild and Reconductoring project to replace aging copper wiring with aluminum wiring, and upgrading th…
Stratigraphic test well drilling and geologic data collection on Titan Pennsuco Plant property in Medley, FL.…
Rebuilding of 8.62 miles of the Northeast NPPD sub-transmission system. Activities would include replacement of existing power poles and conductors…