Categorical Exclusion Determinations: National Energy Technology Laboratory

The current infrastructure is 3.9 miles of overhead copper wires with 95 poles. This infrastructure was installed in the 1970s and is outdated. T…
This project would conduct a study of the current electrical system to identify power poles that are a hazard due to age and wear. Replacements of …