Sub-recipient will Upgrade AVR with Power System Stabilizer, remove and replace disturbance monitoring equipment, install real-time vibration monit…
Office of NEPA Policy and Compliance
October 22, 2025Sub-recipient will Upgrade AVR with Power System Stabilizer, remove and replace disturbance monitoring equipment, install real-time vibration monitoring equipment, install a generator stator gas system analyzer, upgrade continuous monitoring system server and install redundant continuous monitoring system server.