Plan development of the River Parish Sequestration Project, a CO2 transportation and storage solution, and site characterization. Conduct a pipelin…
Remove deteriorating wooden solar PV racking that is mounted atop powerhouse roof, thereby eliminating this threat to powerhouse structural failure…
Wooden pole replacement.…
Administrative and project management activities, building construction, site excavation and preparation, concrete pad installation, equipment inst…
The City of Lakota through Lakota Municipal Utilities will underground approximately 6.26 miles of overhead distribution line. …
Construct 20'x60' structure in which Substation/Switchgearwill be installed. Excavate trenches for conduit installation between Power Plants and S…
Replacement of existing reclosers with new vacuum reclosers, Addition of auto-source transfer equipment on our existing distribution lines to impro…
This project will replace end of life HVAC equipment with new ones. …
Installation of new transmission poles and overhead line equipment in existing right-of-way and removing of existing poles and accessories. Replace…