This project will combine output from preconditioning CO2 to various levels of CO prior to fermentation with LanzaTech’s engineered bacterial isopr…
Computer and literature-based research and analysis, report writing (electronic, meetings (remote, teleconference).…
Sorbent preparation and bench-scale testing of the structured sorbent material.…
Update distribution system in Ansley's entire service area from 2.4kV delta to 12.5kV grounded wye. Replace poles, transformers, overhead conductor…
Install a prefabricated building immediately north of the existing metal building. Reroute the existing conductors from the existing building to th…
his study will identify near-term upgrades that incrementally enhance transfer capability between the two RTOs, with a focus on both addressing nea…
The overall objective of this project is to complete a feasibility study for a Regional DAC Hub that encompasses the Pueblo region in the Colorado …
This Programmatic NEPA CX will cover all activities performed under Phase 1 (Design) of the FOA for all two topic areas.…