This project enhances energy sector cybersecurity by extending a next generation data-centric zero trust communications architecture (DZTA) to bett…
The proposed project includes replacement of 1.5 miles of transmission and distribution lines, which serves 3,429 meters. Specifically, this upgrad…
The project includes adding an automatic transfer switch that is rated 15kv and 600 amps.…
The primary scope of this project involves upgrading obsolete electromechanical equipment (circuit breakers, relays, and regulator controls) within…
Install 6 new 69kV transmission breakers, multiple disconnecting switches, and protection relays. …
The PIO13 project involves the undergrounding of approximately 9.5 miles of overhead lines, which will increase reliability by virtually eliminatin…
Approximately 1.8 miles of the current overhead utility alignment will be moved from aerial that is along old highway 101 to underground along the …
Grid hardening through improving our infrastructure. Rebuild existing transmission lines to improve reliability by using steel poles and to increas…