Upgrading mining site to 3-phase power. Trenching to place 3-phase line underground. Installation of a power vault and transformer. Installation of…
CX-033666: Establish Preventive and Predictive Maintenance to Enhance Grid Resilience in Fort Pierce
This project will involve the installation of 408 fault indicators and 18 automatic switches across 34 distribution feeders within the Fort Pierce …
Grid Resiliency project with new solid dielectric vacuum reclosers, capacitor bank, electronic controls/communications, air insulated switchgear an…
1. Install new substation conduit and manhole system for 13kv distribution. 2. Install new conduit and manhole system for 13kv distribution. 3. En…
Relocation, spacer cable technology, and converting overhead distribution from overhead to underground in areas in Ohio with trees out of right-of-…
1) Rebuild 4,221 feet of overhead power lines behind secondary dune line to protect from encroaching ocean and remove existing poles. 2) Install 2,…
Electrical equipment installation on existing overhead lines and automation of restoration devices.…
Upgrading substation transformer and associated equipment within existing fencing of distribution substation. Also adding animal-deterrent fencing …
Implement remote sensing solutions for vegetation, replace transmission conducts and poles, replace FIR with steel, replace insulators, static line…
The Klickitat will upgrade approximately 3,500 feet of old, outdated single phase distribution line to an underground three phase line. These upgra…