Installation of covered conductor and associated pole replacement in Eastern Grants Pass, OR. …
The Recipient shall conduct basic research and development activities related to the usage of commercially available piezoelectric films and wafer …
Complete front-end engineering design (FEED) and develop cost estimate for CO2 capture from cement plant flue gas
Remove current playground and replace with larger play surface and concrete path to play area…
Rebuild electrical distribution line. Convert 4.5 miles of single phase 6A CWC overhead line to single phase and three phase underground electrical…
Recipient and sub-recipients to standardize the control and communications of modular microgrids. No construction planned during project.…
Install fault indicators onto existing powerlines.…