Electrolysis to simultaneously produce hydrogen and copper sulfate. The electrolyzer will use recycled copper materials for one electrode and a pla…
The proposed project activity is focused on replacing overhead power grid lines with underground conduit and 3-phase wire. Some overhead wire is cu…
Project's primary objective is site characterization including water sample collection, drilling an USDW well, aerial studies, soil gas sampling, a…
This action is to produce graphite from atmospheric CO2 in the laboratory by optimizing the catalyst composition and using a flow cell for proof-of…
The Recipient have identified two project goals. To test and refine the concept of ANMs with two real-world deployments in very different environme…
Navitas is expanding manufacturing in their old facility and has therefore purchased a new facility (5451 S State Street Ann Arbor, MI 48108) where…
Install new electronic reclosers (with control panels), install distribution automation radios with ethernet ports, and install new software and pr…
To purchase and install new equipment to make and test batteries and battery components.…
Annual Trash removal service…
The City of Fremont, Department of Utilities, plans to relocate one of these 69kV transmission circuits, which will include storm mitigation-based …