BUECI plans to upgrade existing aged switchgear with modern, better weatherized vacuum circuit breakers and protective relays. The new system will …
Project's primary objective is site characterization including water sample collection, drilling an USDW well, aerial studies, soil gas sampling, a…
The project will pursue a feasibility study and characterization of geologic suitability for the development of a carbon dioxide (CO2) storage Hub …
The DMEA vegetation management project will perform needed vegetation management along approximately 100 miles of their service territory in Cedare…
After a thorough reliability performance review of all our circuits and the impacts of storms to our grid, we have prioritized areas for improvemen…
Replacing previously reviewed subrecipient NexGen with Semiconductor Components Industries, LLC. (dba onsemi). Subrecipient activities (characteriz…
Install a Battery Energy Storage System (BESS) and smart distribution reclosers on the PGE Oxford-Rural distribution system.…
Replace 32 poles, transfer 59 poles, replace 11,000' of OH 336 spacer with 477 spacer cable, replace 8,100' of 3-500 13.8KV cable with 3-700 15KV, …
Install new and improved fault detection devices on existing facilities designed to mitigate sources of wildfire ignition. Replace existing wood po…
The proposed action is for a new location for field activities on private land in Carbon County, WY (near Wamsutter, WY). A CX determination was gr…