The project includes rebuilding 10 miles of three-phase overhead distribution line to three-phase underground ground distribution power line. This …
The project focuses on Grid Monitoring through the installation and implementation of Electric Advanced Metering Infrastructure (AMI). AMI smart me…
Traverse Electric Cooperative will be rebuilding 8.2 miles of distribution three-phase overhead power line to three-phase underground construction …
The project will create a hub of readily available, easy-to-access, inventory of essential equipment that otherwise has long lead times to be able …
Add 2 pole-mounted communicable electronic reclosers and 1 pad-mounted communicable electronic switch to pre-existing poles and ground sleeve for t…
Reroute existing overhear distribution lines as identified to existing roadway ROW's with underground distribution lines.…
The Klickitat PUD will upgrade approximately 7.5 miles of old, outdated poles, some dating back to 1947. The current poles will be replaced with ta…
Build a 9.75 mile 3-phase overhead distribution electric line on private property along HWY 30 to connect two distribution feeders. This will consi…
DOYON LTD. Plans to overhaul the diesel generator in the City of Galena with the following updates: 1. Installation of the VFD, silencer, radiator …
Install fault indicators, recloser devices, and reconfigure/underground (where feasible) nine miles of older primary wire. These measures improve o…