Completion of full engineering design of a SCADA system for our electric distribution system and installation of SCADA electronic equipment at two …
The proposed activities for this Environmental Questionnaire includes the installation of SF6 circuit breakers, three-phase reclosers, fuse savers …
This project involves installing a new underground line from the Colvill substation to the Grand Portage Band of Lake Superior Chippewa Tribal boun…
This project will consist of the purchase and installation of a dual-fired, natural gas and hot water, double stage absorption chiller.…
Project's primary objective is site characterization including water sample collection, drilling an USDW well, aerial studies, soil gas sampling, a…
Demonstrate the feasibility of a carbon capture and storage project at the Tennessee Valley Authority (TVA) Paradise Power Plant in Muhlenberg Coun…
The Recipient is responsible for ensuring that all activities involving small unmanned aircraft systems (sUAS) are compliant with 14 CFR Part 107 o…
The proposed project is broken into two parts, with the first part covering reconductoring and reconstruction of a single-phase line serving the po…
Replace overhead power line with underground cable within existing easements. …