The City proposes to replace aging and outdated power line infrastructure in City circuits M2982 and M2562. Reconductoring 1.6 miles of distributio…
This is a targeted, reliability and resiliency improvement driven project at the Leesburg Electric North Substation for the replacement of an out o…
This is a targeted, reliability improvement driven project in the City of Fruitland Park. This project will improve resiliency and reliability by i…
Replace the aging Switchgear and Distribution Panel. Equipment is beyond design life.…
The project involves removal of approximately 6,900 feet of overhead electrical distribution lines, replacement of 4 platform structures and pad-mo…
DOE and the DOE DOGE Team identified a land asset located in Illinois which DOE had acquired to support an energy-related project which has since b…
Utilize a state-of-the-art Environmental Scanning Electron Microscope for the characterization of a variety of materials of interest across many NE…
Removal of old asphalt roofing shingles and the installation of new asphalt shingles.…
Construction of a converter station and an overhead high voltage direct current (HVDC) transmission line in the Nikiski area, a submarine HVCD cabl…
Wooden pole replacement (134)…