Replace 32 poles, transfer 59 poles, replace 11,000' of OH 336 spacer with 477 spacer cable, replace 8,100' of 3-500 13.8KV cable with 3-700 15KV, …
Install new and improved fault detection devices on existing facilities designed to mitigate sources of wildfire ignition. Replace existing wood po…
The proposed action is for a new location for field activities on private land in Carbon County, WY (near Wamsutter, WY). A CX determination was gr…
The proposed project will include: replacement of existing AMI utility meters and the installation of new communication network equipment on existi…
This Specific CX addresses the need to measure methane emissions at Jonah Energy facilities in the Upper Green River Basin, WY via mobile laborator…
Replacement of a 5kV structure and upgrade to 13.8kV, undergrounding of cabling and installation of monitoring systems.…
Complete front-end engineering design (FEED) and develop cost estimate for CO2 capture from cement plant flue gas, complete TEA, LCA, business case…
18 aged transmission poles and 1.5 miles of transmission line with distribution line under will be replaced. Pole holes dug with auger or backhoe. …
The project plans to perform vegetation management along a 22.2 mile access road with a Fecon Mulcher and an Excavator with a mulcher head barged t…
A new Advanced Combustion Concept Evaluation Laboratory (ACCEL). This project includes testing super critical carbon dioxide and oxygen combustion …