Upgrading mining site to 3-phase power. Upgrading along existing overhead lines and adding a transmission pole. Installation of a meter and transfo…
Office of NEPA Policy and Compliance
October 20, 2025Upgrading mining site to 3-phase power. Upgrading along existing overhead lines and adding a transmission pole. Installation of a meter and transformer on mine floor.