The projects will require clearing and grubbing of forested areas totaling approximately 1-2 acres followed by grading to construct a 1 MW Battery …
Proposed project activities will include 30 pole relocations and replacements (transmission with distribution under-build) serving rural and tribal…
The project will upgrade a single-phase line to a three phase line within an existing ROW. …
REPLACE 3836 RF METERS WITH AMI METERS. Install one 100' tower and base station.…
REPLACE 2909 RF METERS WITH AMI METERS. Install seven 100' towers and base stations.…
Characterization activities for CO2 storage complex to include: drilling USDW well, magnetic/electro- magnetic surveys, material testing, site mode…
Installing 225 Trip Saver Devices, Replacing 78 poles, and install 3 switches. …
To further advance quantum networks and their applications in the energy sector, Electric Power Board of Chattanooga (EPB) propose a 36-month proje…
Replace the chiller and supporting mechanical equipment, including rooftop condensers, evaporators, and associated compressors, chiller water chemi…
Collection of core plugs from core library at Alaska Geological Materials Center.…