The project includes adding an automatic transfer switch that is rated 15kv and 600 amps.…
The primary scope of this project involves upgrading obsolete electromechanical equipment (circuit breakers, relays, and regulator controls) within…
Install 6 new 69kV transmission breakers, multiple disconnecting switches, and protection relays. …
The PIO13 project involves the undergrounding of approximately 9.5 miles of overhead lines, which will increase reliability by virtually eliminatin…
Approximately 1.8 miles of the current overhead utility alignment will be moved from aerial that is along old highway 101 to underground along the …
Grid hardening through improving our infrastructure. Rebuild existing transmission lines to improve reliability by using steel poles and to increas…
The Pittsburgh Electromagnetic Characterization Laboratory will be used to perform magnetic, optical, and electrical transport measurements for the…
Design and development of a Microgrid Resiliency Station to be constructed near the Spokane Tribal Administrative Offices. This project will includ…