Project's primary objective is site characterization including a 3D seismic survey in Chambers, Jefferson, and Liberty counties, TX.…
Project's primary objective is to complete a storage complex feasibility study. This CX covers only Group A activities, which include routine admin…
Reconductor existing overhead lines at river crossings, replacing bare conductor with covered conductor. In some locations will convert from under…
The project scope includes replacing approximately five circuit miles of outdated copper powerline conductor with new aluminum conductor. This proj…
The project shall consist of the design and installation of a new substation transformer as well as construction of storage pad for existing transf…
In-kind replacement of existing overhead top of pole electric cable, utilizing the majority of existing utility poles, replacing pole top conductor…
Vegetation management to minimize outage frequency and duration along Bromley Rd in Chester MA.…
Vegetation Management (tree trimming, brush reduction, etc.) around distribution power lines in existing Right of Ways (ROWs).…
This CX is to conduct a Phase 1 archaeological survey within the full area of potential effect (encompassing approximately seven miles total) for J…