Replace (6) critical 230 kV wood structures with engineered foundational steel structures.…
Replace (3) critical 230 kV and (2) critical 115 kV wood structures with engineered foundational steel structures.…
Re-conductor existing transmission lines (Bicknell to 3 Points 115 kV line and 3 Points to Sandario Tap 115 kV line) and replace one static conduct…
Sub-recipient will use contracted crews to inspect electrical poles and overhead wires within the sub-recipient's right-of-way and remediate vegeta…
The subrecipient proposes vegetation management to roughly 35 miles of urban circuits along the following: 1) 22 miles (out of the 35-mile circuit)…
The Geary County Infrastructure Upgrade Project will be used to upgrade 16 miles of copper weld electric distribution lines in rural Geary County, …
MDU plans to construct a 230/46 kV addition to the Merricourt Transmission Substation to interconnect two new 46 kV sub-transmission lines, providi…
Excavating and constructing pad mounted electrical equipment for step down interconnection for the City of Luray to Western Cooperative.…
Fall River Rural Electric Cooperative plans to underground 3.22 miles of existing distribution lines in a heavily forested area in and next to Cari…
Rebuilding 2.75 miles of overhead transmission line in Atlantic Beach NC, includes: surveying, vegetation trimming, boring vertical holes to set n…