Re-string overhead conductor from WAPA Granite Falls Substation to Marshall Substation. Upgrading from 477 ACSR to AAAC.…
Re-string overhead conductor from Lake County Substation to Lakeview Substation. Upgrading from 4/0 ACSR to AAAC.…
The project involves replacement of a 1954-era substation transformer at the East Bristol Substation with a modern high-efficiency transformer. No …
Subrecipient proposes to purchase and interconnect a commercially available 9.1 MW, 36.4 MW-hr. battery energy storage system (BESS) within its ser…
This project will produce a silicon oxycarbide coal derived alternative anode active product (SiOC CD AAP) at lab-scale. The SiOC CD AAP will be ch…
MTNT plans to add SCADA capabilities to the local powerplant. Specifically: Purchase a new OnLogic data storage computer as specified. Purchase 5 …
The sub-recipient will evaluate and deploy new wildfire mitigation technologies within its service territory to predict, mitigate, and prevent evol…
Demo of existing compressed air piping and appurtenances and installation of two new variable speed 100 psi air compressors, air dryers, wet tanks,…
Rebuilding 3.25 miles of overhead transmission line in Atlantic Beach NC, includes: surveying, vegetation trimming, boring vertical holes to set n…
Rebuilding 4.3 miles of overhead transmission line in Newport, NC, includes: surveying, vegetation trimming, boring vertical holes to set new pole…