The WEC GRID - Project C (Jones Brook) will include complete Right of Way (ROW) maintenance cutting on the entire 7.2 line miles of the Jones Brook…
The scope of this project is to reroute and replace approximately 2 mi of underground electric circuit, moving it out from under the airport runway…
Demolition and safe removal of existing 69kV underground cable. Installation of new transmission cable, termination, and splicing. Construction of …
Mount a cabinet to the existing structure and install communication wiring/ conduit within the existing substation rock footprint (12 substations).…
Tombigbee will install a new Advanced Meter Infrastructure, Volt/VAR System, SCADA, tie lines to connect our mostly radial system, re-conductor, re…
Equipment and infrastructure will be upgraded during the first 2 years of the project. Three existing combustion units, the Transport Reactor Demon…
Pole replacement, installation, and reinforcement. …
Claverack's BESS-integrated microgrid will directly benefit at least three feeders serving the Steinbach substation. The battery system will use a …
This project would replace 4,100 feet of underground conductor that has reached its useful life and is starting to cause extended outages for our c…
This project will replace 42 aging and damaged utility poles and reconductor 144 spans of our distribution line.…