Overhead to underground conversion of powerline. 6.1 miles of earth will be excavated with 4.42 miles of overhead line removed and 10.6 miles of ne…
The project involves the design, construction, and deployment of CUC's Power Transmission and Distribution Automation Project on the island of Saip…
Overhead to underground conversion of ~6 miles of powerline (Area 7). …
Overhead to underground conversion for approximately 4 miles of powerline. …
Project will develop, deploy, and demonstrate an advanced solid-state transformer system for a water pumping application.…
The proposed action involves laboratory-based activities focused on the preparation of feedstock and post-copper extraction samples. This includes …
Planned activities include the construction of a new 24-inch steel natural gas pipeline spanning approximately 3.75 miles along the existing PREPA …
Installation of battery energy storage systems of various sizes at five sites: Site 1 - Ooltewah, TN, Site 2 - Signal Mountain, TN, Site 3 - River …
The primary goal of the project is to scale up the previously developed process from bench scale to pilot scale. The pilot facility will aim to pro…
Direct Air Capture (DAC) research for removing carbon dioxide from air.…