Chief Joseph-Foster Creek Underground Fiber Optic Cable Installation CX(s) Applied: B4.7Date: 09/14/2015 Location(s): WashingtonOffices(s): Bonneville Power Administration
Snohomish Substation Equipment Replacement and Expansion Project CX(s) Applied: B4.11Date: 09/10/2015 Location(s): WashingtonOffices(s): Bonneville Power Administration
Bonanza Communication Facility Expansion CX(s) Applied: B1.19Date: 09/10/2015 Location(s): IdahoOffices(s): Bonneville Power Administration
Thunder Ridge Communication Site CX(s) Applied: B1.19Date: 09/08/2015 Location(s): IdahoOffices(s): Bonneville Power Administration
Heyburn Substation Door Replacement CX(s) Applied: B4.6Date: 09/03/2015 Location(s): IdahoOffices(s): Bonneville Power Administration
NERC-CIP Security Upgrades 2015 CX(s) Applied: B2.5Date: 09/03/2015 Location(s): Multiple LocationsOffices(s): Bonneville Power Administration
Wautoma-Ostrander No. 1 Upgrade Project CX(s) Applied: B1.3, B4.6Date: 09/02/2015 Location(s): WashingtonOffices(s): Bonneville Power Administration
Benton-Franklin #1 and Benton-Franklin #2 Wood Pole Replacement CX(s) Applied: B1.3Date: 09/02/2015 Location(s): WashingtonOffices(s): Bonneville Power Administration
Conkelley Substation Property Transfers CX(s) Applied: B1.24Date: 08/27/2015 Location(s): MontanaOffices(s): Bonneville Power Administration
Bagley and Comarron Wireless Communication Facilities CX(s) Applied: B1.19Date: 08/26/2015 Location(s): WashingtonOffices(s): Bonneville Power Administration