BPADNR Culvert Replacements CX(s) Applied: B1.3Date: 02/01/2016 Location(s): WashingtonOffices(s): Bonneville Power Administration
Knight to Wautoma Fiber Project CX(s) Applied: B4.7Date: 02/01/2016 Location(s): WashingtonOffices(s): Bonneville Power Administration
NoaNet Fiber Installation at Columbia Substation CX(s) Applied: B4.7Date: 02/01/2016 Location(s): WashingtonOffices(s): Bonneville Power Administration
Reston Substation Telecommunication Upgrades CX(s) Applied: B1.7Date: 01/26/2016 Location(s): OregonOffices(s): Bonneville Power Administration
Electric Lightwave Fiber Optic Cable near Columbia Substation CX(s) Applied: B4.7Date: 01/25/2016 Location(s): WashingtonOffices(s): Bonneville Power Administration
Ross Complex Bridge and Speed Feedback Sign Project CX(s) Applied: B1.13Date: 01/21/2016 Location(s): WashingtonOffices(s): Bonneville Power Administration
Hood River-Coop Transmission Line Wood Pole Replacements CX(s) Applied: B1.3Date: 01/20/2016 Location(s): OregonOffices(s): Bonneville Power Administration
Noble Oaks 2 Property Acquisition and Stewardship Funding CX(s) Applied: B1.25Date: 01/19/2016 Location(s): OregonOffices(s): Bonneville Power Administration
Vera Tap to Trentwood-Valley Way Transmission Line Rebuild (update to previous Categorical Exclusion issued on January 16, 2015) CX(s) Applied: B4.13Date: 01/15/2016 Location(s): WashingtonOffices(s): Bonneville Power Administration
Electronic Equipment, Heating, Ventilation and Air Conditioning, and Security System Replacement and Upgrades at Existing Buildings or Facilities - 2016 thru 2017 (update to previous CX issued on 01-05-16) CX(s) Applied: B1.7, B2.5, B4.6Date: 01/12/20...