Hat Rock Tap Switching Station Equipment Transfer CX(s) Applied: B1.24 Date: 04/10/2014 Location(s): Oregon Offices(s): Bonneville Power Administration
Marion-Alvey Marion-Lane Insulator Replacement Project CX(s) Applied: B1.3 Date: 04/07/2014 Location(s): Oregon, Oregon Offices(s): Bonneville Power Administration
Chehalis-Mayfield Number 1 Line Impairment Structure Replacements CX(s) Applied: B1.3 Date: 04/03/2014 Location(s): Washington Offices(s): Bonneville Power Administration
B3S4-White Bluffs Number 1 and Benton-B3S4 Number 1 Transmission Line Reroute CX(s) Applied: B4.13 Date: 04/02/2014 Location(s): Washington Offices(s): Bonneville Power Administration
Cowlitz Falls Fish Facility Access Agreement Extension CX(s) Applied: A2 Date: 04/02/2014 Location(s): Washington Offices(s): Bonneville Power Administration
Port Townsend Paper Corporation Power Sales Agreement Amendment CX(s) Applied: B4.1 Date: 04/01/2014 Location(s): Oregon, Washington Offices(s): Bonneville Power Administration
Telephone Line Removal Along the Access Road into Wautoma Substation CX(s) Applied: B1.3 Date: 03/17/2014 Location(s): Washington Offices(s): Bonneville Power Administration
Malin Substation Storm Drain and Switchyard Rock Improvements CX(s) Applied: B1.3 Date: 02/06/2014 Location(s): Oregon Offices(s): Bonneville Power Administration
McNary Substation Equipment Acquisition CX(s) Applied: B1.24 Date: 01/29/2014 Location(s): Oregon Offices(s): Bonneville Power Administration
Wood Pole Replacements Along the Targhee Tap and Targhee-Drummond 115-kilovolt (kV) Transmission Line Rights-Of-Way CX(s) Applied: B1.3 Date: 01/29/2014 Location(s): Idaho Offices(s): Bonneville Power Administration