Categorical Exclusion Determinations: Bonneville Power Administration

Electronic Equipment, Heating, Ventilation and Air Conditioning, and Security System Replacement and Upgrades at Existing Buildings or Facilities - 2016 thru 2017 (update to previous CX issued on 01-05-16) CX(s) Applied: B1.7, B2.5, B4.6Date: 01/12/20...
Electronic Equipment, Heating, Ventilation and Air Conditioning, and Security System Replacement and Upgrades at Existing Buildings or Facilities - 2016 thru 2017 CX(s) Applied: B1.7, B2.5, B4.6Date: 01/05/2016 Location(s): Multiple LocationsOffices(s)...
Orchard Tree Planting within North Bonneville-Ross No. 1 Transmission Line corridor - LURR 20150270 CX(s) Applied: B4.9Date: 12/04/2015 Location(s): WashingtonOffices(s): Bonneville Power Administration