Electronic Equipment, Heating, Ventilation and Air Conditioning, and Security System Replacement and Upgrades at Existing Buildings or Facilities - 2016 thru 2017 (update to previous CX issued on 01-05-16) CX(s) Applied: B1.7, B2.5, B4.6Date: 01/12/20...
Install Concrete Slab at Pendleton Fish Acclimation Facility CX(s) Applied: B2.5Date: 01/05/2016 Location(s): OregonOffices(s): Bonneville Power Administration
Electronic Equipment, Heating, Ventilation and Air Conditioning, and Security System Replacement and Upgrades at Existing Buildings or Facilities - 2016 thru 2017 CX(s) Applied: B1.7, B2.5, B4.6Date: 01/05/2016 Location(s): Multiple LocationsOffices(s)...
Radio Upgrades at Franklin, Nine Mile, and Walla Walla Substations CX(s) Applied: B1.19Date: 12/11/2015 Location(s): WashingtonOffices(s): Bonneville Power Administration
Ferry Butte Communication Facility Upgrades CX(s) Applied: B1.19Date: 12/10/2015 Location(s): IdahoOffices(s): Bonneville Power Administration
Chemawa Substation Wireless Communication Facility CX(s) Applied: B1.19Date: 12/08/2015 Location(s): OregonOffices(s): Bonneville Power Administration
Temporary Staging and Parking in Keeler-Oregon City No. 2 Right-of-way CX(s) Applied: B4.9Date: 12/08/2015 Location(s): OregonOffices(s): Bonneville Power Administration
Haystack Butte Radio Communication Site CX(s) Applied: B1.19Date: 12/07/2015 Location(s): WashingtonOffices(s): Bonneville Power Administration
Celilo Roof Fall Protection CX(s) Applied: B2.5Date: 12/07/2015 Location(s): OregonOffices(s): Bonneville Power Administration
Orchard Tree Planting within North Bonneville-Ross No. 1 Transmission Line corridor - LURR 20150270 CX(s) Applied: B4.9Date: 12/04/2015 Location(s): WashingtonOffices(s): Bonneville Power Administration