Happy Camp-Hilltop Radio Path Replacement Project CX(s) Applied: B1.19Date: 03/31/2016 Location(s): CaliforniaOffices(s): Bonneville Power Administration
Surprise Lake Substation Sale of Land Rights and Equipment CX(s) Applied: B1.24Date: 03/28/2016 Location(s): WashingtonOffices(s): Bonneville Power Administration
Wren Substation Fence Replacement CX(s) Applied: B1.11Date: 03/28/2016 Location(s): OregonOffices(s): Bonneville Power Administration
Cape Horn Vista Land Acquisition CX(s) Applied: B1.25Date: 03/21/2016 Location(s): WashingtonOffices(s): Bonneville Power Administration
Sale of Structure 2/6 of East Ellensburg Tap to Columbia-Ellensburg No. 1 Line CX(s) Applied: B1.24Date: 03/21/2016 Location(s): WashingtonOffices(s): Bonneville Power Administration
Pole Replacements on the Cougar-Thurston #1 Transmission Line Corridor CX(s) Applied: B1.3Date: 03/18/2016 Location(s): OregonOffices(s): Bonneville Power Administration
Keeler Substation Electrical Reactor Replacement CX(s) Applied: B4.11Date: 03/18/2016 Location(s): OregonOffices(s): Bonneville Power Administration
Equipment Additions to Multiple Substations and Radio Facilities CX(s) Applied: B1.7Date: 03/14/2016 Location(s): WashingtonOffices(s): Bonneville Power Administration
Redfish Lake Short Access Road (Spur Road) Project CX(s) Applied: B1.13Date: 03/07/2016 Location(s): IdahoOffices(s): Bonneville Power Administration
Bonneville-Hood River Transmission Line Wood Pole Replacements CX(s) Applied: B1.3Date: 03/04/2016 Location(s): OregonOffices(s): Bonneville Power Administration