Looking Glass Ranch Fee Title Funding CX(s) Applied: B1.25Date: 05/19/2016 Location(s): OregonOffices(s): Bonneville Power Administration
Green Crow Logging Road-LURR 20140527 CX(s) Applied: B4.9Date: 05/18/2016 Location(s): WashingtonOffices(s): Bonneville Power Administration
Verizon Longacre Wireless Installation CX(s) Applied: B1.19Date: 05/17/2016 Location(s): OregonOffices(s): Bonneville Power Administration
Kennewick Communication Site Upgrades CX(s) Applied: B1.7, B1.31Date: 05/13/2016 Location(s): WashingtonOffices(s): Bonneville Power Administration
Fiscal Year 2016 Wood Pole Replacement Environmental Review- Keller Tap to Grand Coulee- Okanogan Number 2 CX(s) Applied: B1.3Date: 42501 Location(s): WashingtonOffices(s): Bonneville Power Administration
Fiscal Year 2016 Wood Pole Replacement- Schultz Transmission Line Maintenance CX(s) Applied: B1.3Date: 42500 Location(s): WashingtonOffices(s): Bonneville Power Administration
Rainwater Wildlife Area Conservation Easement CX(s) Applied: B1.25Date: 05/05/2016 Location(s): WashingtonOffices(s): Bonneville Power Administration
Longview-Allston No. 1-2, Structure 2/2 Slope Inclinometer Installation CX(s) Applied: B3.1Date: 05/05/2016 Location(s): WashingtonOffices(s): Bonneville Power Administration
Pearl-Keeler Transmission Line Structure Modifications CX(s) Applied: B4.13Date: 05/05/2016 Location(s): OregonOffices(s): Bonneville Power Administration
Fiber Leasing at Existing Bonneville Power Adminsitration Facilities CX(s) Applied: B4.7Date: 05/04/2016 Location(s): Multiple LocationsOffices(s): Bonneville Power Administration