Bothell-Sno-King No. 1 and No. 2 Transmission Line Upgrades CX(s) Applied: B4.13Date: 03/04/2016 Location(s): WashingtonOffices(s): Bonneville Power Administration
Canby Tap-Malin and Malin-Hilltop Transmission Line Wood Pole Replacements CX(s) Applied: B1.3Date: 03/02/2016 Location(s): CaliforniaOffices(s): Bonneville Power Administration
Windwave Fiber Installation at Big Eddy Substation CX(s) Applied: B4.7Date: 02/25/2016 Location(s): OregonOffices(s): Bonneville Power Administration
Access Road Easement Acquisition for DeMoss-Fossil No. 1 Transmission Line CX(s) Applied: B1.24Date: 02/24/2016 Location(s): OregonOffices(s): Bonneville Power Administration
Bearmouth Microwave Radio Communication Facility CX(s) Applied: B1.19Date: 02/24/2016 Location(s): MontanaOffices(s): Bonneville Power Administration
Coyote Springs-Boardman Fiber Project CX(s) Applied: B4.7Date: 02/17/2016 Location(s): OregonOffices(s): Bonneville Power Administration
Fiscal Year 2016 Danger Pole Replacement Project for Fidalgo-Lopez #5 Structure 7/1 CX(s) Applied: B1.3Date: 02/12/2016 Location(s): WashingtonOffices(s): Bonneville Power Administration
Keeler Substation Septic System Retirement CX(s) Applied: B1.27Date: 02/12/2016 Location(s): OregonOffices(s): Bonneville Power Administration
McNary-John Day Transmission Line Mile 34-38 Access Road Repair Project CX(s) Applied: B1.3Date: 02/09/2016 Location(s): WashingtonOffices(s): Bonneville Power Administration
Aggregated Demand Response Demonstration Project Agreement CX(s) Applied: B4.4Date: 02/08/2016 Location(s): Multiple LocationsOffices(s): Bonneville Power Administration